Skip to Content
EPC Label subsidy disappears on 01/07/2026 — up to €2,500 bonus lost with late renovation

Deadline5 years after purchase

Is your home EPC-rated E or F?

Since 01/01/2023 the Flemish government requires every buyer of a home with EPC label E or F to renovate it to label C (or better) within 5 years of purchase. Non-compliance = fine of €500 to €200,000.

Free on-site visit +32 15 62 70 80

Calculate your deadline

When did you buy your home?

What does the law say? — Flemish EPC renovation obligation

In 3 points.

Who?

Anyone who bought (or inherited) a residential home with EPC label E or F since 01/01/2023.

When?

Within 5 years of the deed. Bought in 2023 → deadline 31/12/2027. 2024 → end 2028. 2025 → end 2029.

What if you don't comply?

Administrative fine of €500 to €200,000. The obligation sticks to the house on resale.

From label E to C — in one renovation project

The 4 pillars that together make the biggest difference.

Heat pump

1–2 label jumps
Replaces your gas or oil boiler with a sustainable system that uses up to 75% less energy. Subsidy up to €8,000.

Insulation

1 label jump
Roof, wall or floor — together with a heat pump the biggest lever for your EPC score. Subsidy up to €5,750.

New windows

0.5 label jump
High-efficiency glazing + insulated frames = less draught and less heat loss. Subsidy up to €5,250.

Ventilation

EPB-compliant
System D with heat recovery = healthy air without heat loss. Mandatory in renovation.

Which subsidies do you get in 2026?

Mijn VerbouwPremie — Flemish government — depending on your income.

WorkCat. 4 (modest)Cat. 3Cat. 2Cat. 1 (higher income)
Air/water heat pump€6.000€4.500€1.500 Removed
Geothermal heat pump€8.000€6.000€4.000 Removed
Hybrid heat pump€4.000€3.000€800
Heat-pump water heater€1.200€1.050€450
Roof insulationmax €5.750max €4.025€16/m²€8/m²
Wall insulationmax €5.000max €3.5007,5–22,5 €/m²5–15 €/m²
Windows & glazingmax €5.250max €3.675€64/m² (max 20m²)€30/m² (max 20m²)
EPC Label subsidy up to €2,500 extra — but only for a label jump filed before 01/07/2026. After that, permanently removed.

Case study: Family V. from Grimbergen

From EPC label E to C in 7 weeks.

Renovatie voorbeeld

Situation

Family of 4, home built 1978, bought June 2023 for €385,000 — EPC label E (368 kWh/m²). Renovation deadline: 31/12/2027.

Approach

  • Replace oil boiler with air/water heat pump (Buderus)
  • Attic floor insulation 22 cm PUR
  • Ventilation system D with heat recovery

Result

Label C
182 kWh/m² (was 368)
€7.800
subsidies received

"Ecowatt NV took everything off our hands — quotes, subsidy applications, site coordination. Everything done in 7 weeks." — V.

Why choose Ecowatt NV?

Buderus System Partner

Extended warranty on your Buderus installation available as a paid option, on request.

3 locations

Vilvoorde (HQ) + warehouse in Eppegem + office & warehouse in Evere — fast on site.

30+ years of experience

RESCert certified technicians, trained on every system.

Subsidy tools & support

Calculator, regional overview, clear criteria — we guide you through.

Active throughout the Brussels — Mechelen — Leuven triangle, with priority service in Vilvoorde, Zaventem, Grimbergen, Mechelen, Zemst, Kortenberg, Leuven and all 19 Brussels municipalities.

Frequently asked questions

The transfer obligation only applies to ownership transfers from 01/01/2023. If you've lived there longer, renovation is not mandatory — but still recommended.

EPC label C means primary energy consumption between 100 and 200 kWh/m²/year.

No, you can work in phases within the 5 years. Ecowatt NV drafts a tailored master plan.

For a 120m² terrace house: typically €25,000 – €45,000 for heat pump + insulation + ventilation. After subsidies often €18,000 – €32,000 net.

We provide a checklist and guide you through the application.

We are active throughout the Brussels-Mechelen-Leuven triangle.

The Mijn EPC Label subsidy (up to €2,500) is permanently removed on 01/07/2026.

Free on-site visit + renovation plan

On site within 7 days. Meeting your deadline without stress.

  • EPC simulation for your home
  • Optimal renovation pack: heat pump + insulation + ventilation
  • Exact subsidy calculation
  • Timing plan fitted to your 5-year deadline

Phone contact within 24h · GDPR compliant

Information updated: April 2026 · EPC renovation obligation: Flemish Housing Code decree · Subsidies: Mijn VerbouwPremie 2026.