Skip to Content

Case studies& projects

Our projects

A selection of recent projects in the Brussels — Mechelen — Leuven triangle: from home heat-pump installations to collective boiler-room renovations in apartment buildings.

Free on-site visit +32 15 62 70 80

Recent projects

Every home is different. Here are a few projects we recently completed — with the technology used, the location and the subsidies our clients received.

Hybrid heat pump — Gert-Jans family
Mechelen Hybrid heat pump

Hybrid heat pump — Gert-Jans family

Replacement of a 22-year-old gas boiler with a Buderus hybrid heat pump (air/water + peak-load boiler). Keeps existing radiators, cuts gas use by about 70%. Installed in 3 days.

€3,000 subsidy

Air/water heat pump — Hellinx family
Zaventem Heat pump

Air/water heat pump — Hellinx family

New single-family home with underfloor heating and good insulation. Buderus air/water heat pump + heat-pump water heater for DHW. Measured SCOP 4.8.

€6,000 subsidy

Full renovation — Hauwaert family
Grimbergen E → C renovation

Full renovation — Hauwaert family

EPC renovation obligation: label jump from E to C in 7 weeks. Heat pump, attic floor insulation (via partner) and system-D ventilation with heat recovery.

€7,800 subsidies

Geothermal heat pump — Rombouts family
Bertem Geothermal

Geothermal heat pump — Rombouts family

Vertical boreholes for a geothermal heat pump in a renovated villa. Highest efficiency, no visible outdoor unit. Coupled with existing low-temperature underfloor heating.

€8,000 subsidy

Boiler replacement — Vanhaeren family
Vilvoorde Condensing boiler

Boiler replacement — Vanhaeren family

Replacement of an end-of-life oil boiler with a Buderus condensing gas boiler (109% efficiency HHV) with modulating burner. Kept existing radiator network, installed in 1 day.

Collective boiler room — Residence Boogaerts
Brussel Co-ownership

Collective boiler room — Residence Boogaerts

Cascade of 3 Buderus condensing boilers for a 14-apartment building. Individual calorimeters per flat. ~25% efficiency gain over the old installation. AGM-friendly phased execution.

75
boilers replaced per year
5-10
heat pumps per year
Air/water & geothermal
3.000+
active clients
30+
years of experience

Ready to start your project?

Free on-site visit within 7 days. No obligation.

Book free visit +32 15 62 70 80