BuderusSystem Partner
Central-heating boilers — expertly installed, honestly advised
From a simple one-day gas-boiler swap to a hybrid system with heat pump: we pick what fits your home, your emitter system and the 2026 regulatory framework.
Free on-site visit +32 15 62 70 80Which boiler do we install for you?
We work with every premium brand — we pick the brand that fits your configuration and budget, not the other way around.
Condensing gas boiler
High-efficiency boiler with modulating burner — the classic choice for an existing radiator network. Fast install, low maintenance, proven technology.
- Efficiency 108-110% (HHV)
- Replaces existing boiler in 1 working day
- €3,500 – €6,500 installed (21% VAT since 01/07/2025)
- Buderus GB192i, Bosch Condens, Vaillant ecoTEC
Hybrid (gas + heat pump)
Smart combination: the heat pump covers 70-80% of the heating season, the gas boiler takes peak cold. Friendly to existing radiators and cuts your gas use by 60-70%.
- Optimal without full insulation renovation
- One controller manages both units
- €800 – €4,000 subsidy 2026 (Cat. 2-4)
- Buderus Logano plus GB192i + WLW196i air/water
Oil phase-out
Old oil boiler at end of life? We compare the options — from gas condensing to hybrid or full heat pump — based on your situation, the regulatory context and 2026 subsidies.
- Full phase-out advice
- Tailored subsidy guidance
- Including tank removal and remediation certificate
Boiler legislation in 2025-2026 — what you need to know
The regulatory framework for heating boilers has changed drastically in the past 12 months. This affects your choice, your cost and your subsidy. Here is the honest regional overview:
Flanders
- Oil boilers: installation banned in new-builds since 01/01/2022. Existing oil boilers may stay until they fail; replacement must then be gas, heat pump or hybrid.
- Gas boilers in new-build: banned since 01/01/2023. Still permitted in existing homes.
- Gas boiler VAT: 21% since 01/07/2025 (previously 6% for homes older than 10 years). On a €5,000 project that is €750 extra.
- Hybrid systems: the HP part keeps 6% VAT, the gas-boiler part is at 21%.
Brussels
- Oil: banned since June 2025 for new installations.
- From 2025: every new heating installation must reach at least 92% efficiency (practically: always condensing).
- Prime Renolution supports hybrid installations and heat pumps, no longer the classic gas boilers (except in boiler-room renovations of multi-dwelling buildings).
Wallonia
- Oil in new-build: banned since March 2025.
- Oil replacement ban: since January 2026 — no new oil boiler may be installed when one fails.
- Primes Habitation supports hybrid and heat-pump solutions; classic gas boilers only qualify in specific cases.
Gas, oil, hybrid — an honest comparison
| Criterion | Gas boiler (condens.) | Oil boiler | Hybrid (gas + HP) |
|---|---|---|---|
| Total cost installed | €3.500 – €6.500 | €4.500 – €8.000 | €8.000 – €14.000 |
| VAT | 21% (since 7/2025) | 21% | 21% boiler / 6% HP |
| Installation time | 1 working day | 1 working day (+1 for tank) | 2-4 working days |
| Efficiency (HHV) | 108-110% | 95-97% | 2,5-3,0 COP jaarlijks |
| Annual heating cost (150 m²) | €1.300 – €1.800 | €1.500 – €2.200 | €1.100 – €1.500 |
| CO2 emissions (kg/yr) | ~3.500 | ~5.200 | ~1.400 |
| Subsidy 2026 (Cat. 4) | None | None | Up to €4,000 |
| Lifespan | 15-20 years | 18-22 years | HP 15-18 yr / boiler 20 yr |
| Future-proof? | Short-medium | Very limited | Long |
Prices and annual costs are average estimates for a typical 150 m² terraced house in the Brussels-Mechelen-Leuven area, at a gas price of €0.09/kWh and oil price of €1.15/L (2025-2026 average).
Boiler replacement — how does an Ecowatt NV work-day unfold?
We wrap up most boiler replacements in a single working day, so you have hot water again that evening. Here is the concrete sequence:
08:00 — Arrival and preparation
Two technicians. We lay down protection, shut off the water, drain the system (30-40 min), and dismantle the old boiler.
10:30 — Installation of the new boiler
Hydraulic connections, gas line (with leak test), flue-gas adaptation, electrical hookup. New insulation sleeves where needed.
13:00 — Filling and bleeding
New expansion-vessel pressure verified, circulation checked, every radiator bled one by one, pressure test at 3 bar for 30 minutes.
14:30 — Commissioning + explanation
First start-up, combustion analysis (CO2, O2, CO), heating-curve calibration, thermostat configuration. 20-30 min walkthrough with the owner: thermostat, DHW schedule, maintenance, fault reporting.
16:00 — Legal inspection and file
Accredited inspector (external, scheduled) seals the installation and issues the inspection certificate. We compile all documents: certificate, invoices, CE-certificates, photos — everything in one PDF file for your subsidy application. You receive a same-day email with the complete file.
Why we work with Buderus, Bosch and Vaillant
We are not a single-brand agent. We are an installer who masters three premium brands and picks the right one for your configuration.
Buderus
German premium brand, part of Bosch Thermotechnik. We are an official System Partner — highest certification level. Specialties: condensing boilers (Logamax, Logano), air/water heat pumps (Logatherm), geothermal pumps (Logatherm WPS). Excellent service support and European spare-parts inventory.
Bosch
Same parent company as Buderus but different positioning. Bosch Condens and Bosch Compress (heat pumps) are slightly cheaper than their Buderus equivalents without real loss of quality. Good choice for budget-conscious clients who still want premium.
Vaillant
German competitor of Bosch/Buderus. ecoTEC plus gas boilers and aroTHERM plus heat pumps are technically very strong. We mainly install Vaillant for clients who already have a Vaillant installation and value continuity.
For heat pumps we also work with Thermia (Swedish, very strong in geothermal), Atlantic (French manufacturer, good for apartments) and Panasonic (Japanese, silent outdoor units for noise-sensitive areas). See also our heat-pumps page.
Boiler FAQs
The 10 questions we get most often during a boiler replacement. Another question? Send us a message or call 015 62 70 80.
Ready to start your project?
Free on-site visit within 7 days. No obligation.
Book free visit +32 15 62 70 80